Chief NS1F2028 Instrukcja Instalacji

Przeglądaj online lub pobierz Instrukcja Instalacji dla Regały Chief NS1F2028. Chief NS1F2828 racks Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 8
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
INSTALLATION INSTRUCTIONS
Knockdown Racks
Spanish Product Description
German Product Description
Portuguese Product Description
Italian Product Description
Dutch Product Description
French Product Description
NS1F12-20-28-36-41
Przeglądanie stron 0
1 2 3 4 5 6 7 8

Podsumowanie treści

Strona 1 - NS1F12-20-28-36-41

INSTALLATION INSTRUCTIONSKnockdown RacksSpanish Product DescriptionGerman Product Description Portuguese Product Description Italian Product Descripti

Strona 2 - CAUTIONS!

NS1F12-20-28-36-41 Installation Instructions2DISCLAIMERMilestone AV Technologies and its affiliated corporations andsubsidiaries (collectively "M

Strona 3 - DIMENSIONS

Installation Instructions NS1F12-20-28-36-413DIMENSIONSNS1F1223 500 LBS (226.8) 12 23 (584.2) 22.6 (574.0) 19.25 (489.0) 28.4 (720.3) 29.2 (742.4) 29.

Strona 4 - ASSEMBLY

NS1F12-20-28-36-41 Installation Instructions4PARTS AND TOOLS REQUIRED B (1)[Top assembly] A (1)[Base assembly] H (22)1/4-20 x 5/8

Strona 5 - Attaching Cross Braces

Installation Instructions NS1F12-20-28-36-415Attaching Top Assembly1. Place top assembly (B) onto the four installed rack rails.(See Figure 3)2. Inser

Strona 6

NS1F12-20-28-36-41 Installation Instructions6Attaching Optional Side Panels, Optional DoorsIMPORTANT ! : If installing doors (not included) and sidepa

Strona 7 - LOADING THE RACK

Installation Instructions NS1F12-20-28-36-417Completing Installation1. Remove and save 1/4" nut from the grounding lug on rackrail. (See Figure 8

Strona 8

NS1F12-20-28-36-41 Installation InstructionsChief Manufacturing, a products divisionof Milestone AV Technologies8800-002167 Rev002012 Milestone AV Te

Komentarze do niniejszej Instrukcji

Brak uwag